Rock technology
Protection object: Zingel Nord Axenstrasse
Flüelen UR, Switzerland / 08.2020 - 10.2020
Between August and October 2020, our rock team carried out work on behalf of the Federal Roads Office FEDRO in exposed terrain above Lake Uri. The aim of the project was to secure the Axenstrasse running along the lakeside. The contract of the rock engineering specialists included anchoring and repair works, the construction of new rockfall protection nets (net class 250kN) as well as natural stone and surfacing works.
Facts & Figures
Company
PORR SUISSE AG
Type
Rock technology
Runtime
08.2020 - 10.2020