Kleeweidstrasse Zurich
Zurich, Switzerland / 07.2019 - 08.2021
Within 25 months, an ensemble of four apartment buildings with 129 flats was built on the outskirts of Zurich.
The houses form a settlement area parallel to the slope, which opens up to the wooded stream Hüslibach in the south. The architecture operates with a conscious optical separation of the attic floors from the standard floors. As a result, the houses appear lower.
Four rows of buildings of different lengths, parallel to the slope, fit into the settlement structure with a projecting and receding facade structure. Between the rows of houses, a generous outdoor space with a semi-public character is created, which expands into the green space to the south.
Facts & Figures
Company
PORR Equipment Services Deutschland GmbH
Type
Residential construction
Runtime
07.2019 - 08.2021
New apartment buildings at the foot of the Uetliberg.
The buildings are certified according to LEED at Level Gold.
To the article "LEAN & LPS", reporrt 01/21.
To the press release "PORR hands over four residential buildings on Kleeweidstrasse in Zurich".
To the PORR project video “Four apartment buildings with 129 flats – November 2021”.
Further Facts
Kleeweidstrasse Zurich
- Architect
- Steib & Geschwentner Architekten AG, Zurich