Bridge construction

Aabachtal viaduct

Lenzburg, Switzerland / 04.2010 - 11.2012

During the period from 2010 to 2012, renovation works were carried out on the Aabachtal viaduct, which is one of the most heavily-used motorway bridges in Switzerland: around 80,000 vehicles per day travel the national route N1 between Zurich and Bern. 

Photo: bridge with six workers and freshly-bituminised surface with Plexiglas noise-protection walls on right side; in background urban development

Facts & Figures


Company

PORR Equipment Services Deutschland GmbH

Type

Bridge construction

Runtime

04.2010 - 11.2012

Principal
Federal Roads Office [ASTRA]

Foundation for the future.

In the course of the restoration and surface renovation, the road surfaces were widened by the addition of a hard shoulder. Panels in the median strip were replaced by a barrier. With this widening work, the viaduct is ready for a possible upgrade to six lanes in the coming years.

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.