Structural engineering
mountain and tunnel water treatment, Los 105
Alptransit Gotthard Nord
Erstfeld, Switzerland / 08.2012 - 08.2013
With a length of 57km, the Gotthard base tunnel is not only the longest railway tunnel in the world, but also a unique masterpiece of the engineer's art. PORR assumed responsibility for the completion of various construction works on the open north section, including a water treatment plant and the removal of installation buildings.
Facts & Figures
Company
PORR SUISSE AG
Type
Structural engineering
Runtime
08.2012 - 08.2013
Site installation for a centenary project.
For the northern installation site, the following core services were carried out:
- Three reinforced concrete ponds
- Two tubular basements with installations
- Renovation and expansion of the preparation pond
- Surrounds and fencing as well as securing the installation site