Cut-and-cover tunnel
Feeder Lenzburg
A1
Lenzburg, Switzerland / 04.2018 - 10.2021
The Lenzburg feeder project to the A1 highway was intended to solve the existing capacity problems at the Neuhof junction. The central element is the Neuhof tunnel.
Facts & Figures
Company
PORR SUISSE AG in consortium
Type
Cut-and-cover tunnel
Runtime
04.2018 - 10.2021
642m traffic relief.
The traffic flow of the motorway feeder road to the A1 (Bern - Zurich) is routed under the Neuhof junction without any crossings using the 362m long tunnel and the two ramps Hero (94m) and Horner (186m).